Client: J T Mackley – Molesey Weir B
This suite of works was being worked out of 3 sites along the banks of the Thames. as well as a lot of different types of equipment being required, the access varied enormously, resulting in the requirement to split loads. Some of the machinery was to be loaded directly onto barges, meaning some far reaching lifts from the attending delivery vehicles. With some careful planning, we and the client arranged the loads between rigids, artics and wagon and drag/large HIAB combinations, thus keeping journeys and site occupation to a minimum.