Case Studies
Arctic HIAB in a tight space
Our Artic-HIAB service proved invaluable again today. Two single piece end frames were collected from the factory at 05.00 hrs and transported to site for just after 07.00 hrs, thus avoiding disruption on the A27 even with a 3.50 metre wide ‘Abload’. Once a few site issues were dealt with, the versatile 36 tonne per…
Bridge refurbishment site – Walton on Thames
Client ‘Driver…can you put that steel beam over there please ?’ Our driver ‘Over where?’ Client ‘Over there, see that pile of bricks?’ Our driver ‘Yup….’ Client ‘See that stack of beams the other side of them?’ Our driver ‘I do…’ Client ‘And beyond that is a hole, just beside that tree, about 20 metres…