Case Studies

Client: Littlehampton Welding Ltd – Facebook offices, London U.K

Client: Littlehampton Welding Ltd – Facebook offices, London U.K LHW had another one of their interesting little jobs… some medium weight fabrications had been built off-site and had to be trucked up to site, into a general cargo/service drop off, and craned into position. All without interrupting the FB buzz just 18 inches above the…

Read more

Austin Divall, Central London

Client: Austin Divall, central London How do you get a 5 metre steel beam through a hole about half a metre square? In short, with skill, care and early in the morning. With access via a car park entrance only, a manhole access was enlarged only as far as structural integrity would allow. Through this…

Read more

Battersea Power Station

Client: Ronin Events, Battersea Power Station How do you render the derelict interior of the world famous Battersea power station safe and secure for thousands of people attending an event? Giant roadplates of course! Oh and it’s Friday morning and the event is Saturday night ! We were tasked by the boys at roadplatehire to…

Read more

Willmott Dixon, the new ‘British Design Museum’ former Commonwealth Institute, Kensington High Street

​A new client for whom we’d not worked with before had a problem with extremely tight access at the prestigious refurbishment at ‘The British Design Museum’ in Kensington High Street​. ​Due to site conditions beyond W.D’s control, 16 modular offices & hundreds of tonnes of material had to be delivered in by truck, up a…

Read more