This innovative range of stackable and interchangeable modular buildings is an ideal package with which to unleash the efficiency of truckloader deliveries.
We are immensely proud of having the capacity, competency and compliances required to transport six of these ISO-based modules all the way from Sussex to Nottingham and have them safely erected in a single shift, whilst using just three trucks.
When speed, cost-effectiveness and precision are required, Southdown can’t be beaten in having the right kit, the right team members and the right attitude.
Where was this service needed?
- Collected from the coast in Sussex and delivered and erected in the north of England
What cranes were used?
- A Volvo FH, 4-axle rigid with a FASSI F990RA.2.27 and a Volvo FH, 4-axle rigid with a FASSI F710RA.2.26
What qualifications did the drivers have?
- ALLMI operator and separate ALLMI slingers/banksman
Were the units glazed?
- Yes, every section had at least one pane of glass in it
How were they connected together?
- They used threaded container clamps
Pictures courtesy of Carl Somner and Lewis Bunn.
Share via:




















